AS 5159.1:2018 pdf free.Trampoline park facilities Part 1: General safety requirements and test methods. 1.3.25 Landing (parkour) box A vaulting box used for landing and dismounting, located beside a trampoline at an elevation above the trampoline bed. 1.3.26 Mattress Domestic bedding that contains springs and/or foam. 1.3.27 Nominal load The maximum load that can be generated in normal use. 1.3.28...
AS NZS 3727.1:2016 pdf free
AS NZS 3727.1:2016 pdf free.Pavements Part 1: Residential. 4.1 DRAINAGE The minimum surface crossfall shall be 2.5% (1 in 40 or 25 mm in every 1 m) to ensure surface drainage. In covered areas or pedestrian only areas, a lesser grade may be appropriate provided the aspects of drainage have been assessed. Where necessary, surface run-off shall be collected in...
AS NZS 61439.2:2016 pdf free – Power switchgear and controlgear assemblies
AS NZS 61439.2:2016 pdf free.Low-voltage switchgear and controlgear assemblies Part 2: Power switchgear and controlgear assemblies. 8.3.2 Clearances Addition: For withdrawable parts, the isolation provided in the isolated position shall at least comply with the requirements in the relevant specification for disconnectors (see IEC 60947-3). This applies with the equipment in new condition, taking account of the manufacturing tolerances and...
DR AS NZS 2243.4:2017 pdf free
DR AS NZS 2243.4:2017 pdf free.Safety in laboratories Part 4: lonizing radiations. 1.4.2 Accident NOTE: The SI unit for activity is the reciprocal second (s), termed equal to one nuclear transformation per second. 1.4.4 Activity median aerodynamic diameter (AMAD) 1.4.5 Adequate protection 1.4.10 Becquerel (Bq) The number. f disintegrations per second. NOTE: This is the SI unit of activity. 1.4.11...
AS 1530.8.1:2018 pdf free – Radiant heat and small flaming sources
AS 1530.8.1:2018 pdf free.Methods for fire tests on building materials, components and structures Part 8.1: Tests on elements of construction for buildings exposed to simulated bushfire attack—Radiant heat and small flaming sources. 3.2 Test exposure conditions 3.2.1 Burning embers Exposure to burning embers impinging on the vertical and underside of exposed horizontal surfaces is simulated by application of a small...
AS 1735.1:2016 Lifts, escalators and moving walks Part 1: General requirements
AS 1735.1:2016 pdf free.Lifts, escalators and moving walks Part 1: General requirements. 4 ALTERNATIVE DESIGN, MATERIALS AND METHODS As technology is developing at a rate at which published Standards cannot keep pace, it is not the intention of this Standard to exclude the use of new technologies, methods or materials. 5 PROCESS TO ESTABLISH THAT A LIFT IS SAFE TO...
AS 2359.1 Amdt 1-2017 pdf free – Powered industrial trucks
AS 2359.1 Amdt 1-2017 pdf free.Powered industrial trucks Part 1: General requirements. Section 4 1 First sentence, delete the text ‘AS 2369.6—2013’ and replace with ‘AS 2359.6—2013’. 2 Item (a), delete the text ‘ISO 6292’ and replace with ‘AS ISO 6292’. 3 Delete the text of Note 2 and replace with the following: ISO/TR 29944 provides guidance on how the...
AS 4487 Amdt 1-2017 pdf free – Condensed aerosol fire extinguishing systems
AS 4487 Amdt 1-2017 pdf free.Condensed aerosol fire extinguishing systems—Requirements for system design, installation and commissioning and test methods for components. Clause 7.7.4 Delete the clause text (including Note) and replace with the following: Warning notices shall have black lettering on a yellow background with a letter size equal to or greater than that detailed in Figures 1, 2 and...
AS NZS 5263.1.3:2016 pdf free
AS NZS 5263.1.3:2016 pdf free.Gas appliances Part 1.3: Gas space heating appliances. 2.7.102 Safety controls for exposed burners Appliances fitted with exposed burners shall not have exposed controls capable of activating and sustaining ignition by momentary operation. 2.8 GAS TRAIN This Clause of AS 5263.0 applies. 2.9 COMBUSTION AIR AND FLUE SYTEMS This Clause of AS 5263.0 applies, except as...
AS ISO 29481.1:2018 pdf free
AS ISO 29481.1:2018 pdf free.Building information models—Information delivery manual Part 1: Methodology and format. 4.4 Complete schema Where the information requirements are satisfied by a BIM, a complete information schema that covers all of the information required for all actors throughout the construction process will be large and comprehensive. Such a schema is relevant in defining all of the project...