AS 4876.1-2002 pdf free.Motor vehicle frontal protection systems Part 1: Road user protection. 1.3.6 Over-bumper VFPS (including nudge bar) A VFPS that is primarily designed to reduce damage to a vehicle in the event of low speed collisions, in which the vehicle’s front bumper is retained and the VFPS is mounted in front of the bumper (refer to Figure 1.1(b)...
AS 2252.1:2002 pdf free download
AS 2252.1:2002 pdf free download.Biological safety cabinets Part 1: Biological safety cabinets (Class I) for personnel and environment protection. 4 CONSTRUCTION REQUIREMENTS 4.1 Outer shell The outer shell shall be of metal which, if not stainless steel, shall be coated with a durable, corrosion-resistant sealing material and shall be sufficiently robust to prevent fracture or distortion in transport and installation....
AS 4816.1–2002 pdf free download
AS 4816.1–2002 pdf free download.Determination of particle size distribution by gravitational liquid sedimentation methods Part 1: General principles and guidelines. Sedimentation techniques may be classified as either incremental or cumulative. Incremental methods are used to determine the solids concentration (or suspension density) of a thin layer at a known height and time. Cumulative methods are used to determine the rate...
AS 16279:2002 Pictorial surface preparation standards for painting steel surfaces
AS 16279:2002 pdf download.Metal finishing—Preparation and pretreatment of surfaces Part 9: Pictorial surface preparation standards for painting steel surfaces. I SCOPE This Standard specifies a series of rust grades and preparation grades of steel surfaces by reference to ISO 8501-1:1988. 2 REFERENCE DOCUMENTS The following document is referred to in this Standard: ISO 8501 Preparation of steel substrates before application...
AS 3745-2002 pdf free download
AS 3745-2002 pdf free download.Emergency control organization and procedures for buildings, structures and workplaces. 2.1 EMERGENCY PLANNING COMMITTEE (EPC) 2.1.1 Formation The EPC shall be formed from representatives of occupant groups and shall include the chief and deputy chief wardens and others who may have specialist knowledge, for example, the house engineer. Building owners, agents. occupiers. lessors or their representatives,...
AS 2788:2002 pdf free
AS 2788:2002 pdf free.Pneumatic fluid power—General requirements for systems. 4 Requirements 4.1 General The requirements stated in 4.1.1 to 4.5 apply to all systems within the scope of this International Standard. 4.1.1 Instructions Pneumatic systems shall be installed and used in accordance with the instructions and recommendations of the system supplier. 4.1.2 Language* The supplier and purchaser shall agree on...
AS NZS 4871.1:2002 pdf free
AS NZS 4871.1:2002 pdf free.Electrical equipment for coal mines, for use underground Part 1: General requirements. 1.5.24 Earth-fault protection Protection against faults between conductors and earth. 1.5.25 Electrical e(lulprnent All items applied as a whole or in part for the utilization of electrical energy, such as items for the generation, transmission, distribution, storage, measurement, regulation, conversion. and consumption of electrical...
AS 4254:2002 pdf free download
AS 4254:2002 pdf free download.Ductwork for air-handling systems in buildings. 2.1 DUCT WORK 2.1.1 General The construction and installation specifications in this Standard include the following: (a) Single prescription method requirements. (b) Alternatives. (c) Performance requirements for specific items that are independent of illustrations, stated as depicting items representative of a class of items too broad to be comprehensively illustrated....
AS 4774.2:2002 pdf free download
AS 4774.2:2002 pdf free download.Work in compressed air and hyperbaric facilities Part 2: Hyperbaric oxygen facilities. 2.1 CHAIBER ROOM 2.1.1 General It shall be ensured that the floor can support the weight of the pressure vessel and all ancillary equipment, both when moving the chamber into place and under operating conditions. Although hydrostatic pressure testing is performed at the manufacturer’s...