AS 4774.2:2002 pdf free download

09-03 comment

AS 4774.2:2002 pdf free download.Work in compressed air and hyperbaric facilities Part 2: Hyperbaric oxygen facilities.
2.1 CHAIBER ROOM
2.1.1 General
It shall be ensured that the floor can support the weight of the pressure vessel and all ancillary equipment, both when moving the chamber into place and under operating conditions. Although hydrostatic pressure testing is performed at the manufacturer’s site, there may be circumstances that require hydrostatic testing after the chamber is installed. Therefore, the floor loading should include capacity for the additional weight of the water in the chamber during hydrostatic testing, or the ability to remove the pressure vessel for testing.
The room housing the chamber should be large enough for not only the chamber, but also patient support and staff activities. Chamber placement within the room should ensure adequate space for chamber operations, patient loading, and support equipment. Access to all sides of the chamber may be required.
2.1.2 Access to chamber and controls
If the chamber is placed near a wall, it shall not hamper the controls or viewports of the chamber.
2.1.3 Chamber rooni fire protection
Fire protection requirements for hyperbaric facilities should be as listed for hyperbaric facilities in NFPA 99. The room should also be equipped with an adequate number of appropriate fire extinguishers.
‘NO SMOKING’ signs shall be in open view. The director of the facility should enforce a no smoking policy.
An effective fire evacuation plan should be established, displayed, and periodically reviewed. At least annually, fire evacuation procedures should be practiced with various scenarios that include patient egress and evacuation. NFPA 99 may be used for guidance.
2.1.4 Emergency systems
In the event of a fire or a medical emergency in the facility, personnel should be able to call for assistance, and be able to activate the emergency response network without leaving the control panel. Alarm repeaters that indicate problems in key supply areas should be located at the operator console.
The chamber room should be equipped with an emergency lighting system that will automatically activate in the event of a power failure. This should include illumination for the chamber control panel and power for chamber systems and patient monitors.AS 4774.2 pdf download.

Download It Now Download Here
ATTENTION: I REALLY NEED YOUR SUPPORT.THANKS A LOT.
AS NZS 60598.2.17:2019 AS pdf free download

AS NZS 60598.2.17:2019

AS NZS 60598.2.17:2019 pdf free.Luminaires Part 2.17: Particular requirements—Luminaires for stage lighting, television and film studios (outdoor and indoor). 17.7.2 The luminaires for certain types of high-intensity discharge lamp, where an explosion risk is declared by the lamp manufacturer, shall incorporate a device to prevent immediate access to the lamp after switching-off or shall be marked in accordance with the...
Download
AS NZS 4859.1:2018 AS pdf free download

AS NZS 4859.1:2018

AS NZS 4859.1:2018 pdf free.Thermal insulation materials for buildings Part 1: General criteria and technical provisions. 2.1 GENERAL This Section provides performance criteria and technical provisions for materials to be used in the thermal insulation of buildings and building services. In addition to this Section the insulating material shall— (a) meet packaging and labelling requirements of Section 3; (b) where...
Download
AS NZS 2442.2:2021 AS pdf free download

AS NZS 2442.2:2021

AS NZS 2442.2:2021 pdf free.Performance of household electrical appliances一Rotary clothes dryers Part 2: Energy efficiency labelling requirements. Section 2 Test requirements, calculations and algorithms for the energy rating label 2.1 General This Section sets out the test requirements, equations and procedures br calculating values of the comparative energy consumption (CEC), and star rating, which appear on an energy rating label....