AS 62054.11:2018 pdf download

09-07 comment

AS 62054.11:2018 pdf download.Electricity metering equipment (a.c.)—Tariff and load control Part 11: Particular requirements for electronic ripple control receivers (IEC 62054-11:2004 (ED.1.1), MOD).
If the bursts are applied while the receiver is in a quiescent state, it shall be verified that the receiver does not start as an effect of the bursts. For this purpose, 3 s after the bursts have been applied a message is transmitted with operate voltage Uf. The output elements shall operate correctly according to the commands of the message.
If the bursts are applied in such a way that bursts occur during a transmission cycle, it shall be verified that bursts did not impede the operation capability of the receiver. For this purpose, the receiver is started by a message with the operate voltage (If. It shall be verified that, despite the application of the bursts, no wrong operation occurs. In cases where the disturbance coincides with the start bit or an information pulse related to this command, or is adjacent to it, it is accepted that no operation is carried out. In all other cases, the command must be carried out.
However, in non-operation or even with some kinds of codes, a malfunction may be accepted if the transient coincides with a pulse position or is adjacent to it.
The application of the bursts shall not affect the internal timers. It shall be verified that after the test, operations carried out based on such internal timers are correctly executed.
7.6.6 Test of immunity to conducted disturbances, induced by r.f. fields
In addition to IEC 62052-21, the following applies.
The receiver shall be tested in a quiescent state and during transmission cycles.
If the conducted r.f. disturbances are applied while the receiver is in a quiescent state, it shall be verified that the receiver does not start as an effect of the conducted r.f. disturbances. For this purpose, 3 s after removing the conducted r.f. disturbances, a message is transmitted with operate voltage Uf. The output elements shall operate correctly according to the commands of the message.
If the conducted r.f. disturbances are applied during a transmission cycle, it shall be verified that the conducted r.f. disturbances did not impede the operation capability of the receiver. For this purpose, the receiver is started by a message with the operate voltage Uf. It shall be verified that, despite the application of the conducted r.f. disturbances, no wrong operation occurs.
The application of the conducted r.f. disturbances shall not affect the internal timers. It shall be verified that operations carried out on the basis of such internal timers are correctly executed.AS 62054.11 pdf download.

Download It Now Download Here
ATTENTION: I REALLY NEED YOUR SUPPORT.THANKS A LOT.
AS NZS 60598.2.17:2019 AS pdf free download

AS NZS 60598.2.17:2019

AS NZS 60598.2.17:2019 pdf free.Luminaires Part 2.17: Particular requirements—Luminaires for stage lighting, television and film studios (outdoor and indoor). 17.7.2 The luminaires for certain types of high-intensity discharge lamp, where an explosion risk is declared by the lamp manufacturer, shall incorporate a device to prevent immediate access to the lamp after switching-off or shall be marked in accordance with the...
Download
AS NZS 4859.1:2018 AS pdf free download

AS NZS 4859.1:2018

AS NZS 4859.1:2018 pdf free.Thermal insulation materials for buildings Part 1: General criteria and technical provisions. 2.1 GENERAL This Section provides performance criteria and technical provisions for materials to be used in the thermal insulation of buildings and building services. In addition to this Section the insulating material shall— (a) meet packaging and labelling requirements of Section 3; (b) where...
Download
AS NZS 2442.2:2021 AS pdf free download

AS NZS 2442.2:2021

AS NZS 2442.2:2021 pdf free.Performance of household electrical appliances一Rotary clothes dryers Part 2: Energy efficiency labelling requirements. Section 2 Test requirements, calculations and algorithms for the energy rating label 2.1 General This Section sets out the test requirements, equations and procedures br calculating values of the comparative energy consumption (CEC), and star rating, which appear on an energy rating label....
Download

LEAVE A REPLY

Anonymous netizen Fill in information