AS NZS 4755.1:2017 pdf free -Demand response framework and requirements for demand response enabling devices

09-04 comment

AS NZS 4755.1:2017 pdf free.Demand response capabilities and supporting technologies for electrical products Part 1: Demand response framework and requirements for demand response enabling devices (DREDs).
1.3.3 Authorized person
A person, other than the user, who is authorized by the remote agent, the supplier of the DRED or the supplier of the electrical product, to access, install or adjust parts or functions of the DRED or electrical product not accessible to the user.
1.3.4 Circumvention device
Any control, control device, software, component or part that alters the operating characteristics during any test procedure, resulting in measurements that are unrepresentative of how that product would perform under comparable conditions in normal operation.
1.3.5 Command
A package of information which originates from the remote agent and which provides instructions to the DRED, regarding the status of the DRED, the execution of Operational instructions and other matters.
1.3.6 Deactivated
Condition of a DRED in which it does not have the capability to pass on operational instructions.
1.3.7 Demand response (DR)
The automated alteration of an electrical product’s mode of operation in response to an initiating signal originating from or defined by a remote agent.
1.3.8 Demand response capability
The ability of an electrical product to provide demand response, when connected to a
DRED.
1.3.9 Demand response enabling device (DRED)
A device that provides the functionalities and capabilities to achieve demand response and that meets the requirements of this Standard.
1.3.10 Demand response event
The period between the initiation and termination of an operational instruction group.
1.3.11 Demand response interface
In relation to a DRED, the physical connections and associated functions that enable a DRED to issue operational instructions to an electrical product. In relation to an electrical product, the physical connections and associated functions that enable an electrical product to receive operational instructions from a DRED.
1.3.12 Demand response mode (DRM)
A mode of operation within specified conditions, constraints or parameters during a demand response event (see Table 3.1).AS NZS 4755.1 pdf download.

Download It Now Download Here
ATTENTION: I REALLY NEED YOUR SUPPORT.THANKS A LOT.
AS NZS 60598.2.17:2019 AS pdf free download

AS NZS 60598.2.17:2019

AS NZS 60598.2.17:2019 pdf free.Luminaires Part 2.17: Particular requirements—Luminaires for stage lighting, television and film studios (outdoor and indoor). 17.7.2 The luminaires for certain types of high-intensity discharge lamp, where an explosion risk is declared by the lamp manufacturer, shall incorporate a device to prevent immediate access to the lamp after switching-off or shall be marked in accordance with the...
Download
AS NZS 4859.1:2018 AS pdf free download

AS NZS 4859.1:2018

AS NZS 4859.1:2018 pdf free.Thermal insulation materials for buildings Part 1: General criteria and technical provisions. 2.1 GENERAL This Section provides performance criteria and technical provisions for materials to be used in the thermal insulation of buildings and building services. In addition to this Section the insulating material shall— (a) meet packaging and labelling requirements of Section 3; (b) where...
Download
AS NZS 2442.2:2021 AS pdf free download

AS NZS 2442.2:2021

AS NZS 2442.2:2021 pdf free.Performance of household electrical appliances一Rotary clothes dryers Part 2: Energy efficiency labelling requirements. Section 2 Test requirements, calculations and algorithms for the energy rating label 2.1 General This Section sets out the test requirements, equations and procedures br calculating values of the comparative energy consumption (CEC), and star rating, which appear on an energy rating label....
Download

LEAVE A REPLY

Anonymous netizen Fill in information