BS EN 1709:2019 pdf free.Safety requirements for cableway installations designed to transport persons – Precommissioning inspection and instructions for maintenance and operational inspection and checks.
3.1 Precommissioning inspection all of the measures required to confirm the readiness of the installation for acceptance 3.2 Operational inspection and checks operations intended for verifying the readiness for operation of the installation before and during operation 3.3 Operating test operation of a defined duration during which the working of the installation is tested 3.4 Readiness for acceptance condition of the installation where the functional and technical safety conditions for acceptance have been fulfilled 3.5 Readiness for operation condition of the installation where the functional and technical safety conditions to allow passengers to be transported have been fulfilled 4.2.1 General The safety principles formulated in EN 12929-1 shall apply. In addition, the scope of this document includes the following hazard scenarios and safety measures. 4.2.2 Hazard scenarios The following events may lead to hazardous situations which may be avoided or limited by the safety requirements of this document: a) lack of compliance of the physical construction of the installation with the documents presented; b) defective interaction of individual components with each other and with their local environment; c) defects as a result of long-term operation, prolonged stoppages or repeated and sustained unfavourable operating conditions; d) use of insufficient suitably qualified personnel; e) operation with the installation or its components in a defective condition;4.2.3.2 General safety a) a precommissioning inspection of the installation prior to its acceptance, intended to verify the correct interaction of the components with each other, and of the installation as a whole with its local environment; b) maintenance work intended to maintain and re-establish the specified condition of the installation and its components; c) operational inspection and checks intended to verify the readiness for operation of the installation before and during operation.BS EN 1709 pdf download.
BS EN 1709:2019 pdf free
ATTENTION:
I REALLY NEED YOUR SUPPORT.THANKS A LOT.