BS EN 50591:2019 pdf free

06-11 comment

BS EN 50591:2019 pdf free.Railway Applications一Rolling Stock 一 Specification and verification of energy consumption.
Energy is an integral quantity. This means that the cumulated energy is the decisive factor. Realistic train operation always takes place under the constraints of infrastructure and operational requirements. The following train modes are used in this standard: -In-service with commercial operation mode: This mode covers the normal operation of a train, including several passenger load cases or a locomotive hauling a consist of freight wagons. The train is moving or is stationary and the HVAC system is running in its normal operation mode. – In-service without commercial operation mode: In this mode a passenger train is stationary, the HVAC system is in operation as for commercial operation but without passengers in the train. This situation occurs frequently, for example when the train is waiting between two commercial runs. Parking mode: A train is in parking mode when it is stationary in depots, with the power supply active, without staff or passengers being on board. Usually, the HVAC system runs with reduced settings for temperature and airflow. Other train modes such as empty carriage stock movements are not considered in this standard as they do not contribute significantly to the annual energy consumption. In this standard the preconditioning (pre-heating or pre-cooling) and cleaning are not considered separately. The corresponding hours shall be counted in the in-service without commercial operation mode.This document incorporates infrastructure and operational conditions into “service profiles” for the train. The service profile for traction and auxiliaries is assessed via train runs along a line for in service with commercial operation and stationary at the depot for in service without commercial operation. HVAC is assessed via an operational point matrix for different operational modes. The energy consumption over such service profiles shall be used as an input when assessing LCC. This requires a well-defined and harmonized methodology for specification and verification of the energy consumption. The selected approach has two steps: a) simulation of the energy consumption of the train for the three energy categories mentioned above; b) verification of the simulation by undertaking measurements.BS EN 50591 pdf download.

Download It Now Download Here
ATTENTION: I REALLY NEED YOUR SUPPORT.THANKS A LOT.
BS ISO 24081:2021 pdf download BS pdf free download

BS ISO 24081:2021 pdf download

BS ISO 24081:2021 pdf download.Ground cassava leaves (Isombe) — Specification. 1 Scope This document specifies requirements and methods of sampling and testing for ground cassava leaves, which are obtained from the processing of fresh cassava leaves (Manihot esculenta Crantz or Manihot glaziovii) intended for human consumption. 2 Normative references The following documents are referred to in the text in such...
Download

BS EN 1463‑2:2021

BS EN 1463‑2:2021 pdf download.Road marking materials — Retroreflecting road studs Part 2: Road test performance specifications. 4 Test sites and conditions 4.1 General Test sites shall be arranged at suitable locations that meet at least the requirements of 4.2 to 4.5. The test results will depend on the weather, traffic and road surface conditions. These shall all be described...
Download
BS ISO 3739‑2:2021 pdf download BS pdf free download

BS ISO 3739‑2:2021 pdf download

BS ISO 3739‑2:2021 pdf download.Industrial tyres and rims Part 2: Pneumatic tyres (metric series) on 5 degrees tapered or flat base rims — Load ratings. 2 Normative references The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited...
Download

LEAVE A REPLY

Anonymous netizen Fill in information