BS ISO 23130:2020 pdf free.Milking and cooling machine installations —Monitoring device for bulk milk cooling tanks – Requirements.
BS ISO 23130 4.2.1.3 The monitoring device shall allow the reading and the adjustment of temperature and time limits for critical and informative alarms by the authorized service personnel (see Tables 2, 3 and 4). 4.2.1.4 The monitoring device shall show whether the milk cooling and storage conditions are as intended, or an alarm has been activated.Alarms shall be clearly indicated in form of a visual signal (for example green, orange, red). Additional information can be shown on a display. In case of abbreviations or codes, the meaning shall be explained by information located next to the monitoring device. In case of textual information, this information shall be provided in the language used most commonly in the country/region. The alarm information shall be available even in case of power supply failure (see 4.2.1.6).The alarm can also be sent to a remote system (e.g. the central control unit of the milking and cooling installation, farm’s PC, and/or the mobile communication device of the person responsible for the operation of the installation). 4.2.1.5 Data (see Table 1) and alarms (see 4.3 and 4.4) to be recorded shall be provided with a date and time and stored for at least 60 days. It shall not be possible to change recorded data manually. A backup system shall be provided to ensure that data are not lost as a result of a breakdown or power failure.Data export shall be provided [for example Comma-Separated-Values (CSV), Java Script Object Notation
[JSON] or others]. 4.2.1.6 The monitoring device shall be provided with sufficient backup power so that, in the event of power failure, the system is able to generate and send the appropriate alarm message(s).In case of devices for retrofitting, the following information shall be provided: a) the installation shall be carried out by a professional; b) approval of the milking and cooling installation manufacturer, if fitting of the monitoring device requires modification of the mechanical, electric or electronic system;c) the function of the whole milking and cooling installation shall be inspected, tested and documented when retrofitting is completed. BS ISO 23130 pdf download.
BS ISO 23130:2020 pdf free
ATTENTION:
I REALLY NEED YOUR SUPPORT.THANKS A LOT.